All articles
10 min read

Cost of Goods Manufactured in India: Build the Schedule

Cost of goods manufactured is direct materials used, direct labour and factory overhead, plus opening work in progress, minus closing work in progress. In India, recoverable tax and idle-capacity overhead stay out.

By Praveen Nune, Co-Founder & CEO · Updated 4 Nov 2026

A welder at a bench in a small Indian workshop, with finished brackets stacked on a pallet and half-built frames waiting on a trolley.

Key takeaways

  • Cost of goods manufactured (COGM) is the cost of the goods your factory completed in a period, whether or not you sold them. Add opening finished goods to COGM and subtract closing finished goods to get the cost of goods sold (COGS).
  • Under AS 2 and Ind AS 2, absorb fixed overhead on normal capacity, and leave out abnormal waste and recoverable Goods and Services Tax (GST). In our worked example, this moves one month’s COGM from ₹14,30,000 to ₹13,76,000.
  • Your statutory profit and loss will not show COGM. Build it from the stock ledger, payroll and overhead accounts, then run the five checks.
  • Five checks confirm the figure: materials tie to the stock ledger, WIP is at cost, the GST split is right, overhead adds back, and units agree.
In this article
  1. 1What is cost of goods manufactured and how do you calculate it?
  2. 2What does a COGM schedule look like in rupees?
  3. 3How does COGM differ from COGS and total manufacturing cost?
  4. 4Which costs do AS 2 and Ind AS 2 keep out of COGM?
  5. 5Why can't an Indian profit and loss statement give you COGM?
  6. 6Where do the schedule's numbers come from, and at what value does work in progress go in?
  7. 7How do you check that a COGM figure is right?
  8. 8How does Arka Inventory help you build the schedule?
  9. 9Conclusion
  10. 10Frequently asked questions

Open the published profit and loss statement of a large Indian manufacturer such as Bajaj Auto and you will not find a line for cost of goods manufactured. Expenses are listed by type, so you have to build the figure from your own records.

That is where the number drifts. Stock ledgers, payroll and factory accounts record what was spent, not what accounting standards allow into the cost of stock. Companies that follow Ind AS apply Ind AS 2. Other companies apply Accounting Standard 2 (AS 2) of the Institute of Chartered Accountants of India (ICAI). For the costs in this schedule the two work the same way, so a figure built from raw balances needs adjusting under either. Confirm which one applies to you with your auditor.

Adding every rupee of factory spend to cost looks tidy, but it can overstate what the goods you completed really cost.

This guide gives you the schedule to fill in, a worked rupee example that shows the size of that gap, and five checks that prove the result. You will also see which numbers come from your stock ledger and which from payroll and the general ledger.

What is cost of goods manufactured and how do you calculate it?

Cost of goods manufactured (COGM) is the total cost of the goods your factory completed in a period, whether or not they were sold. Add direct materials used, direct labour and factory overhead, add opening work in progress, then subtract closing work in progress (Corporate Finance Institute).

The terms, defined once:

  • Direct materials used is opening raw materials + purchases − closing raw materials (Lumen Learning).
  • Direct labour is the pay of people who make the product.
  • Factory overhead is every other cost of running production. AS 2 (revised 2016), paragraph 8, gives fixed examples: depreciation and maintenance of factory buildings and the cost of factory management and administration. Its variable examples are indirect materials and indirect labour.
  • Work in progress (WIP) is goods started but not finished.

Cost of goods sold (COGS) follows from COGM: opening finished goods + COGM − closing finished goods.

For the cost of a single unit built from its bill of materials, see our BOM costing guide. This page covers the period total.

What does a COGM schedule look like in rupees?

A one-month COGM for a small fabricator is ₹13,76,000, or ₹1,720 a unit, built as follows. The figures are our illustrative model, not company data. We assume GST of 18% on materials, 800 finished units in the month and normal capacity of 1,000 units.

LineWorking₹
Opening raw materialsStock ledger2,00,000
Purchases, net of recoverable GSTInvoices of ₹10,62,000 less GST of ₹1,62,0009,00,000
Closing raw materialsStock count(1,50,000)

Direct materials used

2,00,000 + 9,00,000 − 1,50,0009,50,000
Less abnormal scrapScrap report(30,000)
Direct materials in cost9,20,000
Direct labourProduction payroll3,00,000
Variable overheadPower, consumables, actual use1,00,000
Fixed overhead absorbed₹1,20,000 ÷ 1,000 units = ₹120 × 800 units96,000

Total manufacturing cost

9,20,000 + 3,00,000 + 1,00,000 + 96,00014,16,000
Add opening WIP1,80,000
Less closing WIP(2,20,000)

COGM

14,16,000 + 1,80,000 − 2,20,000

13,76,000

Cost per finished unit13,76,000 ÷ 8001,720

Want this schedule in a spreadsheet? Download the COGM schedule template, built with the GST split, normal-capacity absorption and the five checks as formulas.

Now add every rupee of fixed overhead (₹1,20,000) and the scrap (₹30,000) instead. COGM becomes ₹14,30,000, or ₹1,787.50 a unit. That is ₹54,000 too high, which is the ₹24,000 of unabsorbed overhead plus the ₹30,000 of scrap. Start from gross invoices as well and the total reaches ₹15,92,000, which is ₹2,16,000 too high.

How does COGM differ from COGS and total manufacturing cost?

Three figures sit on the same cost flow, and mixing them up is the commonest reading error. Total manufacturing cost is what you spent in the month. COGM adjusts it for work in progress to show what the goods you completed cost. COGS adjusts COGM for finished goods to show what the goods you sold cost. Only COGS reaches the profit and loss statement.

FigureQuestion it answersWorking₹
Total manufacturing costWhat did production cost us this month?9,20,000 + 3,00,000 + 1,00,000 + 96,00014,16,000
COGMWhat did the goods we completed cost?14,16,000 + 1,80,000 − 2,20,00013,76,000
COGSWhat did the goods we sold cost?2,50,000 + 13,76,000 − 3,00,00013,26,000

COGM ran ₹50,000 above COGS in this example because finished goods stock grew from ₹2,50,000 to ₹3,00,000. In a month when you sell more than you make, COGM falls below COGS.

Use COGM to compare cost per unit month on month, set a price floor for each product and value your finished goods. Use COGS for gross margin and for inventory turnover days.

Which costs do AS 2 and Ind AS 2 keep out of COGM?

AS 2 keeps out recoverable taxes, the fixed overhead of idle capacity and abnormal waste, along with selling and distribution costs. Each exclusion moves your COGM.

  • Recoverable taxes (paragraph 7). Purchase cost is the price "including duties and taxes (other than those subsequently recoverable by the enterprise from the taxing authorities)", plus freight inwards, less trade discounts and rebates. GST you claim back as input tax credit (ITC) is recoverable, so it stays out of materials cost. GST you cannot claim is part of cost. Confirm your eligibility with your tax adviser.
  • Fixed overhead on normal capacity (paragraph 9). Normal capacity is the production expected on average over a number of periods "under normal circumstances, taking into account the loss of capacity resulting from planned maintenance". The overhead per unit "is not increased as a consequence of low production or idle plant", and "unallocated overheads are recognised as an expense in the period in which they are incurred". In the example, the ₹24,000 for 200 unused units goes straight to the profit and loss. Our recommendation: set normal capacity from your average output over the past twelve months, adjusted for planned maintenance.
  • Excluded costs (paragraph 13). These are "abnormal amounts of wasted materials, labour, or other production costs", storage costs unless needed in production, administrative overheads that do not help bring stock to its present location and condition, and selling and distribution costs.

Why can't an Indian profit and loss statement give you COGM?

Because Indian companies present expenses by nature, not by production stage. Schedule III to the Companies Act, 2013 sets that layout for Division I (companies following AS) and Division II (companies following Ind AS), with heads such as cost of materials consumed, changes in inventories and employee benefits expense. Bajaj Auto, a large manufacturer reporting under Ind AS, uses it. Its FY2024-25 standalone statement shows these lines, in ₹ crore:

  • Cost of raw materials and components consumed: 32,265.79.
  • Changes in inventories of finished goods, work-in-progress and traded goods: 35.18.
  • Employee benefits expense: 1,579.44.
  • Revenue from operations: 50,010.31.

The inventory-change line combines finished goods, WIP and traded goods, so there is no COGM line to copy. A statement laid out this way will not give you the figure either, so it has to come from the stock ledger and cost records.

By our arithmetic on that one statement, materials are about 64.5% of revenue (32,265.79 ÷ 50,010.31) and employee costs about 3.2% (1,579.44 ÷ 50,010.31). That is one very large manufacturer, so test the pattern against the whole sector. According to the Annual Survey of Industries 2024-25, registered factories reported total input of ₹138.3 lakh crore against output of ₹165.2 lakh crore, about 83.7% (our arithmetic), and total emoluments of ₹8.03 lakh crore, about 4.9% of output (our arithmetic). Inputs dominate and wages are a small slice, so the materials-used line is where care pays.

Where do the schedule's numbers come from, and at what value does work in progress go in?

Take materials from production issues in your stock ledger and labour from production payroll. Take overhead from the ledger, and value work in progress at cost, never at selling price.

  • Materials. The issue cost depends on your valuation method; see inventory valuation methods. Freight inward belongs in purchase cost, and our landed cost calculation guide shows how to add it.
  • Work in progress. AS 2 values inventory at the lower of cost and net realisable value, the estimated selling price in the ordinary course of business less the estimated costs of completion and the estimated costs necessary to make the sale (AS 2).
  • Part-finished units. Use equivalent units, which convert part-finished goods into whole-unit equivalents. For example, 100 units that are 40% converted equal 40 equivalent units for labour and overhead; materials added at the start count as 100.
  • Outsourced processing. Our recommendation: carry cutting, painting or other job-work charges in WIP and spread them over the units completed when the job closes. Our WIP inventory guide covers valuing and ageing WIP, including job work.
A storekeeper hands a crate of steel sheets and fasteners to a production worker across a stockroom counter.

How do you check that a COGM figure is right?

Run five tests. Each passes or fails on a number you can compare.

An accountant and a supervisor inspect a trolley of half-finished metal frames on a factory floor.
  1. 1
    Materials tie to the stock ledger
    Opening + purchases − closing raw materials equals the value issued to production plus scrap and other issues. Pass: zero unexplained difference. Fail: any gap.
  2. 2
    Closing WIP is at cost
    Every WIP line is materials + labour + absorbed overhead to its stage. Pass: no line above cost. Fail: any line priced from selling price.
  3. 3
    GST is split correctly
    GST taken out of purchases equals the ITC booked for those invoices. Pass: equal. Fail: GST removed from purchases differs from ITC booked for the same invoices.
  4. 4
    Overhead adds back
    Absorbed fixed overhead plus the amount charged to profit and loss equals actual fixed overhead (₹96,000 + ₹24,000 = ₹1,20,000). Pass: equal. Fail: any difference means fixed overhead has been dropped or double counted.
  5. 5
    Units agree
    Units in COGM equal receipts into finished goods on the stock ledger. Pass: equal. Fail: any difference needs a WIP or scrap entry.

How does Arka Inventory help you build the schedule?

We supply the materials and production side of the schedule: what went into each batch, what is still in progress and what each input cost to land. Production and bills of materials start on our Advance plan, $499 per month billed yearly as of November 2026. That covers two user licences, with extra users at $52 per month.

  • Materials per batch. We track the materials used in a production batch and let you control stock issues during production. That record feeds direct materials used (check 1).
  • Cost and WIP by stage. Our manufacturing feature gives visibility and control over the cost of production and work in progress for materials at each stage, which is where closing WIP starts.
  • Landed cost. On our Enterprise plan, landed cost allocates transport, import duties, customs fees and other expenses to inventory items.

Labour and factory overhead come from your payroll and ledger. You get a 15-day free trial with full access and no credit card. Setup typically takes a minimum of two weeks, depending on data readiness. Book a demo with our team to see it on your own products.

Conclusion

A COGM figure you can defend rests on three habits: absorb fixed overhead on normal capacity, keep recoverable GST out of materials, and value closing WIP at cost. Use the five checks as a decision rule each month. If check 3 fails, fix the GST split first; in our example, gross invoices moved COGM by ₹1,62,000, more than any other error.

If check 1 or check 5 fails, reconcile issues and receipts in the stock ledger before you touch the schedule. The trap to avoid is carrying last month's closing WIP forward unchanged, so count it on the floor before you close the month. Ready to see the materials and production side of your schedule run on live data? Book a demo with our team and we will walk through it on your own products.

Talk to our team

Leave your details and we'll get back to you.

Frequently asked questions

When goods are completed, debit finished goods inventory and credit work in progress for the COGM amount. When they are sold, debit cost of goods sold and credit finished goods. For example, a month with COGM of ₹13,76,000 gives a debit to finished goods and a credit to work in progress of that amount.
Yes. Download our COGM schedule template, which holds the worked example above. To build your own, enter opening raw materials + purchases net of recoverable GST − closing raw materials, add direct labour and variable overhead, add fixed overhead per unit at normal capacity × units produced, then add opening WIP and subtract closing WIP.
It is factory overhead: factory costs you cannot trace to one unit. AS 2 gives fixed examples (depreciation and maintenance of factory buildings, factory management and administration) and variable examples (indirect materials, indirect labour). Selling costs do not count.
Value closing WIP by costing the units still on the floor: materials issued to them plus labour and absorbed overhead to their stage of completion, using equivalent units. Closing WIP = opening WIP + total manufacturing cost − COGM is only a cross-check.
No. AS 2 excludes selling and distribution costs, and administrative overheads that do not help bring stock to its present location and condition. Factory management and administration is different: AS 2 lists it as a fixed production overhead.

Sources

  1. 1.Accounting Standard (AS) 2 (revised 2016), Valuation of Inventories, paragraphs 7, 8, 9 and 13, Institute of Chartered Accountants of India
  2. 2.Bajaj Auto Limited, Standalone Statement of Profit and Loss, Annual Report 2024-25
  3. 3.How to Calculate Cost of Goods Manufactured (COGM)
  4. 4.The Statement of Cost of Goods Manufactured
  5. 5.Indian Accounting Standard (Ind AS) 2, Inventories, paragraphs 11, 13 and 16, Ministry of Corporate Affairs
  6. 6.Companies Act, 2013, Schedule III, Part II (Division I and Division II), Ministry of Corporate Affairs
  7. 7.Annual Survey of Industries 2024-25 results, Press Information Bureau (Ministry of Statistics and Programme Implementation), 30 September 2026

Keep reading

Arka Inventory.

© 2026 Arka Inventory

Powered by PageLens.ai

Get in touch — we'd love to help.

Request a Demo